Drawings and specifications
Include filter sections, underdrain details, media schedules and coating specifications. Identify the drawing revision and any bid alternates.
Project planning
Early pricing starts with the existing conditions and the limits of the planned outage. Send what you have, even if the design is preliminary.
Include filter sections, underdrain details, media schedules and coating specifications. Identify the drawing revision and any bid alternates.
Note the available access, isolation points, permissible shutdown duration, disposal requirements and how many units must remain in service.
Identify the design phase, estimate due date and anticipated construction window. Flag allowances or quantities that still need field verification.