Rehabilitation of five 13-foot-diameter Aerelators with four filter cells per unit, including larger elliptical manways, 100% solids epoxy coatings and filter media replacement.

All projects

Project scope

Facility

Five 13-foot-diameter Aerelators, each with four filter cells (20 cells total).

Scope

  • Replacement of elliptical manways with new 18 × 24-inch assemblies
  • 100% solids epoxy coating system
  • Filter media replacement

Work stages

  • Existing-condition review and filter-cell access
  • Elliptical manway replacement
  • Epoxy coating application to the interiors
  • Filter media replacement

Outcome

Five Aerelators were rehabilitated with new 18 × 24-inch elliptical manways, a 100% solids epoxy coating system and replacement filter media. The photographs show the original interior condition, replacement manways and coated filter cells.