Coated basin walls and replacement underdrain before media loading
Replacement media in place
Outcome
The rehabilitation renewed the filter media, underdrain system and protective coatings. The selected photographs show the existing condition, key replacement stages and media in place.
Eleven selected project photographs show the main rehabilitation stages. Select a photo to view it larger. Grout splatter on the blue walls has been lightly retouched in two installed-underdrain views.
Before rehabilitation
Existing filter troughs and interior condition before rehabilitation.Deteriorated existing coating on a filter interior surface.Existing underdrain bed exposed before replacement.Interior detail of an existing underdrain component before replacement.
Removal & preparation
Removal of the old underdrain system and surrounding material.Filter floor exposed during removal and preparation for the replacement system.
Underdrain components
Replacement underdrain components staged for installation.
Coating & replacement underdrain
Upper view of the coated basin walls during the underdrain replacement work.Replacement underdrain surface and coated basin walls before media loading. Grout splatter on the blue walls has been retouched for presentation.Closer view of the installed underdrain surface before media loading. Grout splatter on the blue walls has been retouched for presentation.
Replacement media
Replacement filter media in place beneath the existing troughs.