The supplied after-coating photographs document the new interior coating finish. Filter media replacement was also included in the project scope.
Actual project photographs. Select a photo to view it larger. The after-coating photographs show the interiors before media loading.
Before rehabilitation
Existing gravity filter interiors before rehabilitation. Temporary wood framing digitally removed for clarity.Filter row before abrasive blasting and recoating. Temporary wood framing digitally removed for clarity.Interior detail showing the previous coating condition.
After coating
Filter interiors after application of the epoxy coating system.Coated filter row before media loading.Coated walls and troughs viewed from the operating walkway.Interior coating detail, with the media area exposed.Coated trough and internal steelwork, viewed along the trough.